Three levels of responsibility, not of quality.
START, PLUS and FINISH differ in how far we take your house before the keys. FINISH is the default.
A solid start
Open shell with the facade already finished, for those who want to run the rest their own way, with a team they trust.
- Design adapted for prefabrication
- Foundations, from scratch or from wherever you are
- Wall structure with the concrete facade, and the roof trusses
- Delivery and assembly
A closed house
Closed shell with the facade already finished, sealed and protected from the weather, ready for the next trades.
- Everything in START
- Roof covering, flashings, gutters, soffits
- Windows and exterior doors
Ready for interior finishing
We take the build to developer standard: what is left for you are the interior decisions, not the structure.
- Everything in PLUS
- Screeds, partition walls, ceiling
- Services with a heat pump: heating, water, electrical, low-voltage
- Heat-recovery ventilation · PV optional
What you receive
- The design adapted for prefabrication, and the building permit filed as your representative
- Foundations, or the takeover from ground level
- Precast walls with the facade finished in the factory, and the roof trusses; transport and assembly
- Roof covering, gutters, flashings and soffits; windows and exterior doors
- Screeds, partition walls and ceilings
- Services with a heat pump: heating, water, electrical, low-voltage; heat-recovery ventilation
What remains, and who does it
- Utility connections to the plot (power, water, wastewater): always outside the package; MABUDO quotes and arranges them as a separate service, before you sign
- Interior finishing: floors, wall colors, interior doors, the kitchen, the bathrooms and the sanitary fittings: yours, or a finishing crew of your choice
- Photovoltaics: optional, priced in the configurator
- Selected additional works on the plot: quoted separately
Scope as MABUDO defines it, Poland, September 2026. The exact FINISH scope comes with the specification and the contract. Plot suitability is checked against dimensions, access and local planning requirements.
From your chosen design to the agreed handover scope.
About 3 months of work on site to developer standard; about 6 months from the decision to the keys, formalities included.
The house is closed typically about 2 weeks later.
The foundations are built on your plot while the elements of your house are produced in the factory.
You configure the home. You learn the price. The contract secures it on clearly stated terms.
MABUDO's two-number time frame, Poland, 2026, indicative under typical conditions; the traditional line is MABUDO's picture of a wet build with separate crews, about 16 months in total, its stages illustrative. The exact date and the payment schedule are written into the contract.
Every option priced before production starts.
Design, package and options on one screen, each with its price. What the screen shows goes into the contract.
Prices shown are in Polish zloty for the FINISH package in Poland, 2026. U.S. pricing is in preparation.




Your package, your price, your date.
The scope and the date go into the contract before production starts. An advisor walks you through the seven steps.













